维普中文期刊产品整合服务
26篇 您的检索式:作者名="Grubbstrom R W"
    题名 作者 年代 出处 被引量
1A net present value approach to safety stocks in a multi-level MRP system显示文摘Grubbstrom R W 1999International Journal of Production Economics1999,59,:1
2Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns显示文摘Tang O Grubbstrom R W 2005International Journal of Production Economics2005,9394,:1
3Analysis of the effect of commonality in muhi-level inventory systems applying MRP theory 显示文摘Zhou L Robert R W Grubbstrom W 2004International Journal of Pro- duction Economics2004,90,:1
4An Overview of Input-Output Analysis Applied to Production-Inventory Systems显示文摘Grubbstrom R W Tang O 2000Economic Systems Research2000,12,1:1
5Invertory trigger control policies developed in terms of control theory显示文摘Grubbstrom R W Wikner J 1996International Journal of Production Economics1996,45,1:1
6A stochastic model of multi-level/multi - stage capacity - constrained production - inventory systems显示文摘GRUBBSTROM R W WANG Z 2003International Journal of Production Economics2003,8182,1:1
7A stochastic model of muhi-level/multi-stage capacity-constrained production-inventory systems 显示文摘Grubbstrom R W Wang Z 2003International Journal of Production Economics2003,8182,1:1
8Planned lead time determination in a make-to-order remanufacturing system 显示文摘Tang Ou Grubbstrom R W Zanoni S 2007International Journal of Production Eco- nomics2007,108,12:1
9Optimal production opportunities in a remanufacturing system显示文摘GRUBBSTROM R W TANG O 2006International Journal of Production Research2006,44,1819:1
10The EOQ with backlogging derived without derivatives显示文摘GRUBBSTROM R W ERDEM A 1999International Journal of Production Economics1999,59,1:1
11The detailed coordination problem in a two-level assembly system with stochastic lead times 显示文摘TANG O GRUBBSTROM R W 2003International Journal of Production Economics2003,8182,:1
12A Net Present Value Approach to Safety Stocks in a Multi-level MRP System 显示文摘Grubbstrom R W 1999International Journal of Production Economics1999,59,13:1
13Planning and replanning the master production schedule under demand uncertainty 显示文摘TANG Ou GRUBBSTROM R W 2002Int J Production Economics2002,78,:1
14The detailed coordination problem in a two-level assembly system with stochastic lead times显示文摘Tang O Grubbstrom R W 2003International Journal of Production Economics2003,8182,1:1
15The detailed coordination problem in a two-level assembly system with stochastic lead times 显示文摘TANG O GRUBBSTROM R W 2003International Journal of Production Economics2003,8182,1:1
16The detailed coordination problem in a two-level assembly system with stochastic lead times显示文摘Tang O Grubbstrom R W 2003International Journal of Production Economics2003,8182,1:1
17The detailed coordination problem in a two-level assembly system with stochastic lead times显示文摘Tang O Grubbstrom R W 2003International Journal of Production Economics2003,8182,:1
18The detailed coordination problem in a two-level assembly system with stochastic leadtimes显示文摘TANG O GRUBBSTROM R W 0,,:1
19A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems显示文摘Grubbstrom R W Wang Z 2003International Journal of Production Economics2003,8182,:1
20Analysis of the effect of commonality in multi-level inventory systems applying MRP theory显示文摘ZHOU Li GRUBBSTROM R W 2004International Journal of Production Economics2004,90,2:1
返回顶部 每页显示:
共2页 首页 上一页 第1页 下一页 末页 /2 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费