维普中文期刊产品整合服务
104篇 您的检索式:作者名="Ghomi S M T"
    题名 作者 年代 出处 被引量
1A new heuristic ed project scheduling in stochastic networks using critical chain concept显示文摘Rabbani M Fatemi Ghomi S M T Jolai F etc 2007European Journal of Operational Research2007,176,2:1
2Due Windows Group Scheduling Using an Effective Hybrid Optimization Approach显示文摘Behnamian J Zandieh M Fatemi Ghomi S M T 2010International Journal of Advanced Manufacturing Technology2010,46,5678:1
3A simulation model for multi- project resource allocation 显示文摘Ghomi S M T F Ashjari B 2002International Journal of Project Management2002,20,2:1
4A new heuristic for resource - constrained project scheduling in sto- chastic networks using critical chain concept 显示文摘Rabbani M Ghomi S M T Jolai F Lahiji N S 2007European journal of operational research2007,176,2:1
5Efficient stochastic hybrid heuristics for the multi-depot vehicle routing problem显示文摘Mirabi M Fatemi Ghomi S M T Jolai F 2010Robotics and Computer Integrated Manufacturing2010,,6:1
6Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage显示文摘BOLOORI Arabani A R FATEMI Ghomi S M T ZANDIEH M 2011Expert Systems with Applications2011,38,1:1
7A new heuristic for trained project scheduling in sto- chastic networks using critical chain concept 显示文摘RABBANI M GHOMI S M T F JOLAI F 2007European Journal of Operational Research2007,,2:1
8A cross-docking scheduling problem with sub-popula- tion multi-objective algorithms 显示文摘BOLOORI Arabani A R ZANDIEH M FATEMI Ghomi S M T 2012International Journal of Advanced Manufacturing Technology2012,58,1:1
9Extension of common cycle lot-size scheduling for multi-product,multi-stage arborescent flow-shop environment显示文摘GHOMI F S M T TORABI S A 2002Iranian Journal of Science & Technology Transaction B2002,26,1:1
10Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines显示文摘Jenabi M Fatemi Ghomi S M T Torabi S A Karimi B 2007Applied Mathematics and Computation2007,186,1:1
11A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept显示文摘Rabbani M Ghomi S M T olai F 2007European Journal of operational Research2007,,2:1
12A simulation model for multi-project resource allocation显示文摘Fatemi Ghomi S M T Ashjari B 2002International Journal of Project Management2002,20,2:1
13The capacitated lot sizing problem: A review of models and algorithms显示文摘Karimi B Ghomi S T Wilson J M 2003Omega2003,31,:1
14Path critical index and activity critical index in PERT networks显示文摘Fatemi Ghomi S M T Teimouri E 0,,01:1
15Nonlinear Dynamic Analysis of Steel Palte Shear Walls Including Shear and Bending Deformations显示文摘Sabouri Ghomi S Roberts T M 1992Engineering Structures1992,14,5:1
16The capacitated lot sizing problem: a review of models and algorithms 显示文摘Karimi B Fatemi Ghomi S M T Wilson J M 2003Omega2003,31,5:1
17A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic 显示文摘Behnamian J Fatemi Ghomi S M T Zandieh M 2009Expert Systems with Applications2009,,11:1
18Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan显示文摘HEKMATFAR M FATEMI GHOMI S M T KARIMI B 2011Applied Soft Computing2011,11,8:1
19Optimal constrained non-renewable resource allocation in PERT networks with discrete activity times 显示文摘Hashemin S S Ghomi S M T F Modarres M 2012Scientia Iranica2012,19,3:1
20Integrated scheduling of production and rail transportation显示文摘Hajiaghaei-Keshteli M Aminnayeri M Fatemi Ghomi S M T 2014Computers&Industrial Engineering2014,74,1:1
返回顶部 每页显示:
共6页 首页 上一页 第1页 下一页 末页 /6 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费